Space Shuttle NASA Mission Reports: 1986 and 1988 Missions, STS 61-C, STS-26, STS-27

Nonfiction, Science & Nature, Science, Physics, Astronomy, Other Sciences, History
Cover of the book Space Shuttle NASA Mission Reports: 1986 and 1988 Missions, STS 61-C, STS-26, STS-27 by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781465760814
Publisher: Progressive Management Publication: January 3, 2012
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781465760814
Publisher: Progressive Management
Publication: January 3, 2012
Imprint: Smashwords Edition
Language: English

These official final program mission reports issued by the NASA Johnson Space Center cover missions in 1986 and 1988: STS 61-C, STS-26, and STS-27. For obvious reasons, a mission report was not issued for Challenger's final mission 51-L on January 28, 1986.

In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS 61-C: The major objectives of this flight were to successfully deploy the SATCOM KU-2/Payload Assist Module-Delta Class (PAM-D II) and SYNCOM IV-5/UNQ satellites and to perform the planned operations of the Material Science Laboratory-2 (MSL-2). An option was maintained to fly the Getaway Special (GAS) Bridge Assembly (GBA) and the Hitchhiker G-l (HG-1) to replace the SYNCOM, if it was not ready for flight. This option was exercised since the SYNCOM-IV-5/UNQ did not fly during STS 61-C. The crew for this twenty-fourth Space Shuttle mission were Robert L. Gibson, Commander, U. S. Navy, Commander; Charles F. Bolden, Lt. Col., U. S. Air Force, Pilot; Franklin R. Chang-Dias, Ph. D., Steven A. Hawley, Ph. D., and George D. Nelson, Ph. D., Mission Specialists; Robert J. Cenker and William Nelson, Payload Specialists. Mr. Robert J. Cenker is a representative of the Radio Corporation of American (RCA). Mr. William Nelson is a member of the U. S. House of Representatives.

STS-26: The primary objectives of the STS-26 mission, the first flight following the Challenger accident, were to successfully deploy the Tracking and Data Relay Satellite-C/Inertial Upper Stage (TDRS-C/IUS); to perform all operations necessary to support the requirements of the Orbiter experiment (OEX) Autonomous Supporting Instrumentation System (OASIS) payload; and to conduct operations of the 11 middeck payloads. The crew for this twenty-sixth mission of the Space Shuttle Program was Frederick H. Hauck, Capt., U. S. Navy, Commander; Richard O. Covey, Col., U. S. Air Force, Pilot; and John M. Lounge, George Nelson, Ph.D., and David C. Hilmers, Lt. Col., U. S. Air Force, Mission Specialists.

STS-27: The Space Shuttle vehicle was successfully launched from Launch Complex 39B at the Kennedy Space Center (KSC) on December 2, 1988, with solid rocket booster (SRB) ignition occurring at 337:14:30:33.987 G.m.t. (08:30:33.987 a.m.c.s.t.). Data indicate that all subsystems performed satisfactorily. The crew for this twenty-seventh flight of the Space Shuttle were Robert L. Gibson, Commander; Guy S. Gardner, Pilot; and Richard M. Mullane, Jerry L. Ross, and William M. Shepard, Mission Specialists.

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

These official final program mission reports issued by the NASA Johnson Space Center cover missions in 1986 and 1988: STS 61-C, STS-26, and STS-27. For obvious reasons, a mission report was not issued for Challenger's final mission 51-L on January 28, 1986.

In these thorough reports, with information and specifics not available on NASA website mission descriptions, each orbiter system is reviewed in detail along with technical information on performance and anomalies.

STS 61-C: The major objectives of this flight were to successfully deploy the SATCOM KU-2/Payload Assist Module-Delta Class (PAM-D II) and SYNCOM IV-5/UNQ satellites and to perform the planned operations of the Material Science Laboratory-2 (MSL-2). An option was maintained to fly the Getaway Special (GAS) Bridge Assembly (GBA) and the Hitchhiker G-l (HG-1) to replace the SYNCOM, if it was not ready for flight. This option was exercised since the SYNCOM-IV-5/UNQ did not fly during STS 61-C. The crew for this twenty-fourth Space Shuttle mission were Robert L. Gibson, Commander, U. S. Navy, Commander; Charles F. Bolden, Lt. Col., U. S. Air Force, Pilot; Franklin R. Chang-Dias, Ph. D., Steven A. Hawley, Ph. D., and George D. Nelson, Ph. D., Mission Specialists; Robert J. Cenker and William Nelson, Payload Specialists. Mr. Robert J. Cenker is a representative of the Radio Corporation of American (RCA). Mr. William Nelson is a member of the U. S. House of Representatives.

STS-26: The primary objectives of the STS-26 mission, the first flight following the Challenger accident, were to successfully deploy the Tracking and Data Relay Satellite-C/Inertial Upper Stage (TDRS-C/IUS); to perform all operations necessary to support the requirements of the Orbiter experiment (OEX) Autonomous Supporting Instrumentation System (OASIS) payload; and to conduct operations of the 11 middeck payloads. The crew for this twenty-sixth mission of the Space Shuttle Program was Frederick H. Hauck, Capt., U. S. Navy, Commander; Richard O. Covey, Col., U. S. Air Force, Pilot; and John M. Lounge, George Nelson, Ph.D., and David C. Hilmers, Lt. Col., U. S. Air Force, Mission Specialists.

STS-27: The Space Shuttle vehicle was successfully launched from Launch Complex 39B at the Kennedy Space Center (KSC) on December 2, 1988, with solid rocket booster (SRB) ignition occurring at 337:14:30:33.987 G.m.t. (08:30:33.987 a.m.c.s.t.). Data indicate that all subsystems performed satisfactorily. The crew for this twenty-seventh flight of the Space Shuttle were Robert L. Gibson, Commander; Guy S. Gardner, Pilot; and Richard M. Mullane, Jerry L. Ross, and William M. Shepard, Mission Specialists.

More books from Progressive Management

Cover of the book Department of Defense Chemical and Biological Defense Program - Comprehensive Reports on Military Efforts to Protect Against NBC, WMD, Chemical, Biological, Radiological, and Nuclear (CBRN) Threats by Progressive Management
Cover of the book Apollo and America's Moon Landing Program: NASA Recommendations to Space-Faring Entities - How to Protect and Preserve the Historic and Scientific Value of U.S. Government Lunar Artifacts by Progressive Management
Cover of the book Bombs Over Bosnia: The Role of Airpower in Bosnia-Herzegovina - NATO Operation Deny Flight, Serbs and the Death of Yugoslavia, Deterrent Use of Airpower, Deliberate Force, Dayton Peace Accord by Progressive Management
Cover of the book 2014 American Arctic Strategy: Russia and China, Minerals and Resources, Recoverable Oil in the Arctic Circle, Arctic Militarization, Freedom of Navigation, Sea Lines of Communication by Progressive Management
Cover of the book George Washington and the Politics of War and Revolution: American Revolutionary Leadership, Washington's Command - Power of Symbolism, Unity, and Purpose, Awakening of a Continent, Analysis Framework by Progressive Management
Cover of the book Complete Guide to 1999 Operation Allied Force in Kosovo: After Action Report to Congress, Studies, Serbian Atrocities, Milosevic, Balkan Stability, A-10s over Kosovo, Victory of Airpower by Progressive Management
Cover of the book Lost Unconventional Warfare Lessons from the Yugoslav Front: World War II, Cetniks, Guerrilla Warfare, German Anti-Guerrilla Tactics and Doctrine, OSS Involvement, Plans for Demobilization by Progressive Management
Cover of the book Fire Weather (Agriculture Handbook 360) Part 1 - Guide for Application of Meteorological Information to Forest Fire Control Operations, Winds, Moisture, Temperature, Fronts, Thunderstorms, Climate by Progressive Management
Cover of the book Entrepreneurship as a Source of Economic, Political, and Social Improvement in Sub-Saharan Africa: Botswana, Malawi, Zambia, Five Factors, Freedom, Labor, Infrastructure, Governance, Environment by Progressive Management
Cover of the book The Columbia River System: Inside Story (Second Edition) - Dams, Water Projects, Hydrology, Flood Control, Fish and Wildlife, Power, Navigation, Irrigation, Snake River, Kootenai, Willamette by Progressive Management
Cover of the book 21st Century Adult Cancer Sourcebook: Adrenocortical Carcinoma, Cancer of the Adrenal Cortex - Clinical Data for Patients, Families, and Physicians by Progressive Management
Cover of the book Wildland Fire and Aviation Program Management Operations Guide: Wildfire Prevention, Firefighting Equipment, Smokejumpers, Prescribed Burns, Suppression Chemicals, Delivery Systems by Progressive Management
Cover of the book Russian Organizational Learning in the Context of the Afghanistan and Chechnya Counterinsurgencies: Soviet Military History, Operational Art, World War II, Interventions in Hungary and Czechoslovakia by Progressive Management
Cover of the book Essential Guide to Lt. General Herbert (H.R.) McMaster, National Security Advisor: Thinking and War Scholarship, Moral and Ethical Soldiers, War on Terrorism, Paper on Future Wars and Technology by Progressive Management
Cover of the book 2018 Cybersecurity Reports: Cybercrime and the Darknet, and Multiyear Plan for Energy Sector Cybersecurity - Protecting Electricity Delivery, Energy Reliability, and Power Utilities from Cyber Attack by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy